Foundation Excavation-Russellville, Kentucky (Logan Aluminum)

Rock Solutions began blasting indoors at Logan Aluminum mid-December of 2016. The project was finished in early January 2017. Rock Solutions had to take extreme safety precautions. Blasting mats were utilized with each and every shot. The job consisted of line drilling and blasting mass rock. Even with the challenges blasting indoors, Rock Solutions finished the job successfully, safely, and on time.